Montage
|
| Individual tombstone |
 |
1. Foundations
The individual tombstone assembled is on two prefabricated
foundations of reinforced concrete embedded directly on the
grave. One in the head second in legs of the mound heaped
up on the grave. |
2. Levelling
Foundations one ought crosswise to level, instead the foundation
in the bed-head we place 2-3cm from bottom foundation and
like this we obtain the slope windfall of the water from the
tombstone. |
 |
 |
3. Subframe
On correctly embedded in the ground foundations we put the
bottom of the tombstone(the subframe) which is earlier prepared
en bloc to the independent montage. |
4.Frame
The frame we arrange on the subframe adverting on the maintenance
of equal distances in relation to the subframe. |
 |
 |
5. Plate
On the frame we arrange lid plate and we seat her evenly in
relation to the frame. On plate we arrange the plinth, then
using assembly-openings we join with the cement the plinth
and the sepulchral plate. |
6. Finishing
After assembling of elements of the tombstone into the whole
one ought the tombstone to clean up on dry, and with the then
special assembly-glue to fill places of points of junction
of elements of the monument.. |
 |